Sunday, December 5, 2010

maintence time

As the dreaded xmas rush is about to begin our days have gone very quickly. organising stock and ordering enough product to get us thru the holiday season is a major headache but has to be done.
Having said that I've still managed to get in my daily ride as well as doing some work on the boat. Diane has painted inside all the cupboards  and we have repainted the motor to make it go faster!.

I have been working on sealing the storage cupboards on the flybridge. After a major paint strip i have applied a fibreglass layer to the entire suface,very dusty work but once painted it will be totally moisture proof.